1:21IQF freezing: garlic processing example
See a garlic application and the product discharge around the freezing equipment. The freezing arrangement and throughput depend on the raw material and product requirements.
Watch videoTunnel IQF freezing equipment for food-processing lines. Define the raw material, incoming condition and required product core temperature before selecting the conveyor, airflow and refrigeration configuration.

Your equipment is already included below. Add your raw material and the result you need.
These videos show example equipment configurations. We confirm the specification for your product, process and capacity when preparing your proposal.
Series overview
Tunnel IQF freezing equipment for food-processing lines. Define the raw material, incoming condition and required product core temperature before selecting the conveyor, airflow and refrigeration configuration.
Provide product dimensions, moisture, stickiness, feed temperature and target kg/h. Confirm the feed depth and how the product is distributed on the belt.
Agree the required product core temperature and residence time. Air temperature inside the tunnel and the temperature of the food are different specifications.
Select belt layout, usable width and airflow for the product. Discuss whether a fluidized-bed arrangement is suitable; it is not assumed for every food.
Define the refrigeration load, compressor electrical demand and other installed power separately. Specify the refrigerant and package scope for the project.
Confirm the footprint, insulation, access, drainage and defrost procedure. Coordinate the freezer with upstream cooling or draining and downstream packing.
The final configuration, throughput, dimensions, utilities and supply scope are specified in your equipment proposal.
Discuss this seriesNo. Piece size, incoming temperature, moisture, belt loading and required core temperature affect the duty. The proposed throughput must state the product and design conditions.
Freezing time is selected for the product and required outlet condition. Confirm it with the equipment design and a relevant product trial instead of applying one time to all foods.
Provide the product heat load, site conditions, utilities and any existing refrigeration plant. The proposal distinguishes cooling capacity from electrical input and defines the supplied equipment.
The estimated lead time is around 35 working days. The final schedule, its starting conditions and warranty terms are agreed in the quotation and order.