FROM PRODUCT IDEA TO EQUIPMENT PLAN

Food Processing Line Solutions

Configure your processing line around your product, capacity and factory layout.

Start with the product you want to make

Explore the main processing routes below. Each line is configured for your raw material and required finished product.

Vegetable & fruit washing

Product
Leafy vegetables, root vegetables and fruit requiring washing and surface-water removal.
Typical stages
Sorting, washing, rinsing, cutting where needed, and suitable water removal.
To define
Product fragility, soil load, cut size and the next processing step.

French fries production

Product
Potato strips, with the process selected for a fresh, chilled or frozen par-fried product.
Typical stages
Preparation, cutting and rinsing; blanching, drying, par-frying and IQF for frozen fries.
To define
Potato variety, strip size, finished-product target and capacity basis.

Potato chips production

Product
Crisp potato slices with an agreed thickness, finish and seasoning.
Typical stages
Washing and peeling, slicing, rinsing, water removal, frying, seasoning and packing.
To define
Slice thickness, frying method, oil management and packaging format.

Continuous frying

Product
Vegetables and other products suited to continuous frying, subject to process review.
Typical stages
Feeding, controlled frying, conveying, surface-oil removal and oil filtration as specified.
To define
Product size, residence time, heating source and upstream/downstream equipment.

IQF freezing

Product
Prepared food products requiring individual quick freezing.
Typical stages
Product preparation, feeding, freezing and transfer to packing or cold storage.
To define
Product dimensions, inlet and outlet temperatures, throughput and refrigeration scope.

See how projects are configured

These examples show specific projects. Their stated capacities are project references, not a capacity guarantee for other products.

Explore all projects

Define capacity before choosing equipment

The same kg/h figure can mean incoming raw material or finished product. Agree the basis and process conditions before comparing configurations.

What to share

  • Raw material & finished product

    Product type, dimensions, condition and required finish; photos or samples can be discussed during follow-up.

  • Capacity & operating hours

    State input or output kg/h, planned hours per day and any future expansion.

  • Factory & utilities

    Available space, equipment access, electricity, water, drainage and heating or refrigeration arrangements.

What we work through with you

  • Processing route & equipment scope

    Identify the necessary stages, optional equipment and interfaces with your existing machines.

  • Layout & utility requirements

    Discuss equipment placement and connections around the available factory space.

  • Project quotation

    Confirm the specification, inclusions, exclusions, schedule and service arrangements in writing.

From requirements to delivery

  1. Confirm product and capacity
  2. Develop configuration and layout
  3. Agree scope and quotation
  4. Manufacture and arrange testing
  5. Coordinate shipping, installation and training

Testing, installation and training arrangements depend on the agreed project scope.

JOYSHINE MACHINERY

Plan your processing line

Select a solution and tell us what you already know. You can leave undecided project details blank.

A useful first enquiry

Tell us the raw material, intended finished product and target capacity. Include whether the capacity refers to incoming material or finished output. We can discuss drawings, photos and samples during follow-up.

Other ways to contact us

Fields marked * are required.

Add project details (optional)

These details help us prepare a more relevant response. Leave anything you have not decided blank.

Include a unit and whether this is incoming raw material or finished product.

We’ll review your enquiry and contact you to confirm the next steps.

We use your details to reply, prepare a quotation and follow up on your project. Read our Privacy Policy.

Questions before planning a line

Can I choose a line just by its kg/h rating?

Capacity alone is not enough. Raw material, product dimensions, yield, treatment time and the slowest stage affect throughput. Confirm whether the figure refers to incoming material or finished output and agree the operating conditions.

Can you integrate equipment into an existing factory?

We can discuss new lines and upgrades. Share the current process, machine dimensions, transfer heights, utilities and available space so the proposed interfaces can be reviewed.

What is included in the supply and service scope?

Equipment, control systems, utilities, installation, training, spare parts and warranty terms are confirmed in the written quotation and agreement. The scope varies by project; please identify any items you expect us to supply.

How long does manufacture take?

The estimated lead time is around 35 working days. The final schedule and its starting conditions are agreed in the quotation and order. Transport and installation are arranged separately.

Home Products WhatsApp Contact