French fries
Specify potato size range, incoming soil and the peeled product needed before strip cutting.
SINGLE MACHINES / PRODUCT SELECTION
JSMG series brush-roller machines wash and peel potatoes and suitable root vegetables. Select the roller configuration around the raw material, required skin removal and usable product yield.
Select the configuration around your raw material, required result and production process.

Examples of equipment configurations and operation. Confirm the model, product and supply scope for your project.


01 / Application fit
Start with the potato condition and the finish required for fries, chips or further preparation. The peeling method, contact time and handling should be selected together. A clean-looking surface and a high usable yield are separate acceptance criteria.
Specify potato size range, incoming soil and the peeled product needed before strip cutting.
Define the surface finish and any inspection or trimming before slicing.
For carrots or another root crop, confirm the material, skin and shape before selecting roller type or reusing a potato configuration.
02 / Process
Sort and remove excess soil as required before peeling.
Select the contact method and duration around the required surface finish.
Plan removal of peel waste, water handling and transfer.
Include inspection or trimming before the next processing stage.
Process planning guide. Actual equipment scope and operating settings are confirmed for your application.
No. The amount of skin removed and the usable product remaining after peeling are different measures. Define both acceptance criteria when comparing configurations.
It may be possible with a suitable working mechanism and settings, but suitability must be checked for the product. Send the material list, sizes and required finish.
Plan this according to your finished-product requirements and the condition of the incoming potatoes. Agree the process after a trial rather than assuming peeling removes every defect.
Potato Peeling Machine
Tell us what goes in and what you need at the outlet. Include the target rate, current process and any workshop constraints.
Images and model configuration can be confirmed with the equipment proposal.