1:03Drum seasoning machine: interior and test setup
See the drum interior and discharge arrangement. Seasoning feed, drum settings and product handling are configured for the intended snack.
Watch videoCompare JSGT continuous-drum and JS-BJTW batch seasoning series for snacks and other suitable foods. Choose the feeding, tumbling and dosing arrangement around the product and recipe.

Your equipment is already included below. Add your raw material and the result you need.
These videos show example equipment configurations. We confirm the specification for your product, process and capacity when preparing your proposal.
Series overview
Compare JSGT continuous-drum and JS-BJTW batch seasoning series for snacks and other suitable foods. Choose the feeding, tumbling and dosing arrangement around the product and recipe.
Use the required feed pattern and recipe changes to choose a continuous drum or a batch machine. The two arrangements have different loading and discharge cycles.
Provide product size, fragility, temperature and the seasoning recipe. Check powder flow, adhesion and any liquid application with representative samples.
Confirm powder feeder, liquid spray and controls in the supply list. Adjustment methods and accessories depend on the selected configuration.
For a batch machine, specify usable kg per batch and the complete cycle. For a continuous drum, agree feed rate, residence time and an even product flow.
Agree coating distribution, product breakage and cleaning between recipes. Confirm access and changeover requirements for the actual equipment.
The final configuration, throughput, dimensions, utilities and supply scope are specified in your equipment proposal.
Discuss this seriesNo. Hourly output also depends on loading, seasoning and unloading time. Use the complete operating cycle when planning the line.
This depends on the supplied feeders, spray equipment and the recipe. Confirm the required accessories and test the product before defining the scope.
The result depends on the food, seasoning, dose and operating conditions. Agree a sampling method and acceptance criteria for your recipe.
The estimated lead time is around 35 working days. The final schedule, its starting conditions and warranty terms are agreed in the quotation and order.